On Friday they had 2 walls up. I came back on Monday and found the first floor exterior walls all completed with only 8 small walls to put up and then the celing joists to put on. Once that is done, the second story work can begin. They pumped out the water in the basement today and will be pouring the floor down there soon. Here are a couple of shots of the progress as well as a shot of the man behind the curtain, our builder, Kraig. Studly, eh?